Discussion about this post

User's avatar
Dolf's avatar

CRAZY!

Mitesh Shetty's avatar

The US assembly call is the right one, and not just for quality control. The first production run is where you find out what your tolerances actually mean in practice versus on a drawing. Having that feedback loop close where you can walk the floor, catch a fit issue before it's in 500 units, and talk directly to the person running the line is worth far more than the cost delta at that stage.

The Shenzhen dynamic you described around shared supply chains is real, and it's structural. The factories aren't doing anything wrong by their logic; they're optimizing for utilization. The misalignment is that their incentive is throughput, and yours is differentiation. US assembly doesn't fully solve that either, but it buys you something Shenzhen can't: the ability to control what actually ships under your name while you're still figuring out what the product needs to be.

1 more comment...

No posts

Ready for more?